Choose the repositories
Connect the GitHub repositories the team selects for review.
GitHub integration guideVeriFlow · paid-pilot evaluation
A practical evaluation framework for GitHub-based teams of 20–100 engineers. Start with what VeriFlow does today, agree how to measure change, and keep proposed targets separate from product results.
01 / Current product
These are the behaviors present in VeriFlow’s current GitHub workflow and review examples. They are not pilot analytics or outcome claims.
Connect the GitHub repositories the team selects for review.
GitHub integration guideUse .github/review.yml to configure repository-specific review behavior.
The connected-repository workflow runs when a pull request opens or is updated.
How GitHub reviews workGeneral reviews post a summary and actionable comments tied to a file path and line, with severity.
Inspect a sample reviewThe demo runs a dedicated security pass and returns a separate severity-labelled block. The current automatic GitHub webhook path runs the general review; the separate pass is not wired into that connected-repository path in the current code.
Open the public review demo02 / Measurement plan
Agree repository scope, sprint boundaries, finding identity, severity labels, and the comparison windows before interpreting a change.
Data group A
Proposed data views only. VeriFlow-specific calculation and export capability was not established by the research.
Count eligible pull requests that receive a completed review.
Count findings first recorded and findings resolved in each sprint, broken down by severity.
Findings introduced minus findings closed in a sprint. Zero is neutral; a negative value means more were closed than introduced.
For each open finding, measure elapsed days since it was introduced, grouped by severity.
Count open findings that are within an agreed time of their deadline or already overdue.
Data group B
Use historical records or a repeatable time survey. Without a comparable baseline, improvement claims cannot be attributed with confidence.
Median elapsed time from detection to closure, calculated separately for each severity.
Count findings introduced on merged PRs divided by the number of merged PRs in scope.
Track median time from PR open to first review and from PR open to merge as separate measures.
Hours per developer per week spent on the three activities, reported separately or with a consistent combined measure.
Share of PRs that pass initial review without substantive rework, alongside the share that need one or more changes.
03 / Risk-aware interpretation
Review planning
The OWASP Code Review Guide 3.0 describes about 250 lines per hour as a rough planning baseline for review duration, explicitly not a review-quality target. Its example cyclomatic-complexity bands are 1–10 stable, 11–15 medium risk, and 16–20 high risk. It also recommends setting review intensity by the risk profile of the module rather than treating every change alike.
Apply the bands as context for planning. They do not measure VeriFlow accuracy or promise a particular review speed.
Security metrics
Security Metrics for Engineering Sprint Reviews recommends team-repository counts by severity, findings introduced versus closed, SLA proximity, finding age, and behavior trends. Its release-gate examples include new critical findings and existing criticals with EPSS above 0.3 that have passed SLA.
These are evaluation and governance examples, not VeriFlow metrics or enforcement features.
04 / Research proposals · unverified
The figures below are provisional evaluation suggestions from the supplied research. No VeriFlow-specific results or verified metric calculations were established.
By day 60
Measure daily active use across the participating team; confirm the eligible-user definition first.
Unverified suggestionDuring an agreed audit window
Check whether inline findings and remediation links appear on the reviewed PRs.
Unverified suggestionBy the end of the evaluation period
Findings closed are at least equal to findings introduced; calculate introduced minus closed.
Unverified suggestionCompare weeks 1–4 with weeks 9–12
Use the same repositories, severity rules, and finding deduplication in both periods.
Unverified suggestionVersus the customer-provided baseline
Compare medians separately by severity; retain the same start and closure definitions.
Unverified suggestionDuring the first four weeks
Compare customer-reported review, debugging, and remediation time with the agreed baseline.
Unverified suggestionCompare weeks 1–4 with weeks 8–12
Compare median time from PR open to merge for matched PR cohorts.
Unverified suggestionEvaluation-design assumptions · unverified
The research suggests 8–12 weeks as a minimum-duration planning range and estimates 50–200 PRs per week for a 20–100-person team. These are not VeriFlow’s offered or required paid-pilot terms, and they are not a promise about any team’s volume. Set the actual duration, comparison windows, and expected PR volume from the participating team’s context.
05 / Suggested decision rubric · unverified
The research proposes a decision review when three of four gates are met. Meeting all four can support an expansion decision; neither threshold guarantees one.
Adoption — daily active use ≥40% by week 8.
Finding trend — neutral-or-better net finding velocity in the final month (closed ≥ introduced).
Developer time — measured time savings ≥30% against the customer baseline.
Workflow integration — confirmed in the team’s agreed audit of real PRs.
Choose the evidence with your team
Contact the VeriFlow team to discuss a paid-pilot evaluation. Scope and commercial details are confirmed in that conversation.